Investing today in tomorrow's generations.

Clean energy, built properly

On the parks it worked on, our team built 614 MW. Once running, they produce emission-free energy for years.

Piles driven straight into the ground need no concrete foundations and can be pulled out when the park reaches the end of its life.

We work to a daily plan, with access roads planned from the start, so the land is disturbed as little as possible.

≈ 0.86 TWhenergy per year (estimated)
≈ 260,000 tCO₂ avoided per year (estimated)

Estimate: 614 MW × about 1,400 kWh per installed kW per year; about 0.3 t of CO₂ avoided per MWh.