
Services
Piles and structures
Setting out, pile driving, pull-out tests and fixed-tilt or tracker structures, with our own machinery.
Piles are the base of every park. We set them out from the survey plan, drive them straight into the ground with our own machines and check with pull-out tests that they hold. Then we mount the structures, fixed-tilt or single-axis trackers, and tighten every joint to the torque the manufacturer asks for.
On Corbii Mari the team drove 1,016 piles in a single day, out of the 130,200 in our scope.
What's included
- Survey setting-out of the piles
- Pile driving with our own machines
- Pull-out tests
- Fixed-tilt structures (e.g. 2P) and single-axis trackers
- Torque tightening and checks


Other services
Have a park to build? Send us the layout and the deadline.
Request a quote

