Projects · Romania
Butimanu187 MW
Dâmbovița County, Romania2025–2026In progress
187 MWbuilt by our team
≈ 322,000modules (estimated)
155people on site at peak
About the project
One of the largest solar parks under construction in Eastern Europe. Two scopes run in parallel: mechanical (pile driving, structures and module mounting) and electrical (DC/AC cabling, connections and commissioning).
Works carried out
- Setting out and pile driving
- Mounting structures
- Module installation
- DC/AC cabling
- Connections and commissioning
Project carried out by the SMACO team while working for a previous company.
The module count is estimated from the capacity (about 580 Wp per module); exact quantities come from the site reports.